Tiling around the master front window
Building the Porter Davis Drysdale 30 at Parks Edge - Our Family Home in the Making!
Sunday, 24 August 2014
Week 14 - Facade Tiling & Flooring
I didn't get to the house myself but hubby dropped by today and sent me these pics
Sunday, 17 August 2014
Week 13 - Everything including the kitchen sink!
It seems that lots has been happening this week:
* Sinks, basins, taps, mixers, towel rails, toilets, and spa bath have been fitted
* Ducted heating outlets installed (evap cooling outlets been cut out and vent to be installed this week)
* All Robe doors have been fitted
* Electrical work commenced. Power points throughout.
Most importantly we have DATES:
Practical Completion Inspection: Sept 9 or Sept 10
Official handover of keys: Sept 16
Very Exciting!! Now the packing, selling old stuff and organising the new stuff begins!!!
Above pic showing our new sink mixer
Pic on left is of bathroom & pic on right is the ensuite
Our Dune coloured garage door
Our feature wall in family room: colour Dune Shadow
What's next: roller blinds to be ordered ASAP! Concretor quotes to begin! Fence quote to be agreed upon with our neighbour!
Latest news: our existing neighbour - Sri Lankan and not overly friendly have put their house up for LEASE. Yay for new neighbours & hopefully they will be a little more friendly!!
Tuesday, 12 August 2014
Week 12.5 - Sneak peak inside
Hubby arranged to have someone come out to quote the blinds today and here are the amazing pics he shared with me. Definitely brightened up my afternoon!
Monday, 11 August 2014
Week 12 - Garage Door, Tile Grout
Not much to report this week and unfortunately no photos as the house was locked up
* Garage Door has been installed (but was up so we couldn't see it)
* Tile Grout done
What's next:
* Tiling of Facade (around Master window)
* Glass Splashback measured, and to be fitted
* Blind/Curtain quote from Jaleigh Blinds on 12th Aug (visited their showroom on Saturday)
Window Coverings:
* Garage Door has been installed (but was up so we couldn't see it)
* Tile Grout done
What's next:
* Tiling of Facade (around Master window)
* Glass Splashback measured, and to be fitted
* Blind/Curtain quote from Jaleigh Blinds on 12th Aug (visited their showroom on Saturday)
Window Coverings:
| Master | Sunscreen + Pinch Pleat Curtains (Blockout) |
| Robe | Double Roller (sunscreen+blockout) |
| Ensuite | Single Sunscreen Roller (if any) |
| Ensuite Toilet | Double Roller (sunscreen+blockout) |
| Theatre | Sunscreen + theatre Curtains (full length to floor) on tracking |
| Dining | Double Roller (sunscreen+blockout) |
| Family x2 | Double Roller (sunscreen+blockout) |
| Alfresco (Family) | Sunscreen Roller (2 Panels - Large Panel at Door Opening) + Sheer Curtains (Wave Top) |
| Rumpus Door | Sunscreen Roller (2 Panels - Large Panel at Door Opening) + Sheer Curtains (Wave Top) |
| Bedrooms 2,3,4 | Double Roller (sunscreen+blockout) |
| Laundry | Single Sunscreen Roller |
| Study Voids x2 | Plantation Shutters |
Labels:
blinds,
curtains,
garage door,
grout,
roller blinds,
Tiles,
tiling
Tuesday, 5 August 2014
Week 11 - Tiles
We're on the home straight now - almost 3 months in. Tiles were laid on Saturday.