Monday, 11 August 2014

Week 12 - Garage Door, Tile Grout

Not much to report this week and unfortunately no photos as the house was locked up

* Garage Door has been installed (but was up so we couldn't see it)
* Tile Grout done

What's next:

* Tiling of Facade (around Master window)
* Glass Splashback measured, and to be fitted
* Blind/Curtain quote from Jaleigh Blinds on 12th Aug (visited their showroom on Saturday)

Window Coverings:

Master Sunscreen + Pinch Pleat Curtains (Blockout)
Robe Double Roller (sunscreen+blockout)
Ensuite Single Sunscreen Roller (if any)
Ensuite Toilet Double Roller (sunscreen+blockout)
Theatre Sunscreen + theatre Curtains (full length to floor) on tracking
Dining Double Roller (sunscreen+blockout)
Family x2 Double Roller (sunscreen+blockout)
Alfresco (Family) Sunscreen Roller (2 Panels - Large Panel at Door Opening) + Sheer Curtains (Wave Top)
Rumpus Door Sunscreen Roller (2 Panels - Large Panel at Door Opening) + Sheer Curtains (Wave Top)
Bedrooms 2,3,4 Double Roller (sunscreen+blockout)
Laundry Single Sunscreen Roller
Study Voids x2 Plantation Shutters

No comments: